We have exported our goods to Korea, Turkey, Bulgaria, Romania, Russia, Italy, Norway, the Usa, Canada, etc. Our AdvantagesProducts Massive quantity in Inventory, No MOQ essential We comply with all the international standards, such as ISO9001 and TS16949 specifications. PersonnelOur income folks are nicely qualified to accommodate your requests and communicate English for your comfort. Ce Authorized eight Seater Electric Golfing Club Vehicle with EPT EPTT
Solution Description
TianEPTT EPTyi Electrical EPT eight Seat Golf Cart | |||||
Loading capability | eight individual | Max Velocity | 25-28km/h(adjustable) | ||
Driving range | 70-80km | Climbing capability | le20% | ||
EPTTler | InEPTT brand separately thrilled | ||||
EPT | 48V/4KW separated thrilled motor | ||||
Battery | Massive ability deep cycle lead-acid battery 8V/piece 6 items | ||||
Charger | Computer EPTT charger enter/output 220V/48V, doing work recent 25A | ||||
Charging time | 8hrs | ||||
Best | Car engineering materials injunction molding | ||||
Entire body | Injunction molding modeling style separable substitute | ||||
Windshield | Laminated EPT with wiper | ||||
Seats | Sponge seat with protection belt for each seat | ||||
Instrument board | PP substance injunction molding Electrometer, Front ligEPTT switch, turning ligEPTT change, electric powered lock switch, shift swap | ||||
EPTing and sign | Entrance light-weight, turning light, tail light, horn and buzzer | ||||
Steering Sys | EPT steering, automobile backlash payment | ||||
Brake Sys | Rear brake composite pedal brake | ||||
Front Axle amp Suspension | Non unbiased suspension, EPT cylindrical EPT EPT take in | ||||
Rear Axle amp Suspension | Integral rear axle, Non impartial suspension, EPT, cylinEPTTtype EPT EPT take up | ||||
Tyre | Golf cart tyre eighteen*eight.50-8 diameter 452mm |
In depth Pictures
EPTT Demonstrate
-FAQ-
Q1. What is your EPTT strategy?
A: EPTTly, we pack our goods in containers with iron frames. If you have any EPTT demands we could follow accordingly.
Q2. What is your conditions of payment?
A: By T/T, 30% as deposit, and 70% just before shipment.
Q3. What is the direct time?
A: It normally takes about ten-15 daEPTTafter obtaining deposit.
This autumn. Can you create in accordance to technical drawings?
A: Indeed, we can make in accordance to your technical drawings. We can build molds and fixtures.
Q5. What is your sample coverage?
A: Considering that this product is higher-value product, we can settle for sample by price cut. Need to the orEPTTbe large in amount, we may possibly even consiEPTTrefunding for the sample.
Q6. Do you take a look at all your items just before shipping?
A: Of course, we have a hundred% test before shipping and delivery
Q7: How do you make our organization EPTT-phrase and great connection?
A: one. We guarantee excellent high quality and good cost to ensure our customers’ advantages
two. We reXiHu (West EPT) Dis.Hu (West EPT) Dis.d each and every consumer as our good friend and do organization sincerely.
Q8: Exactly where is your manufacturing unit dependent in?
A: Our manufacturing facility is based mostly in Panzhuang EPTT Park, XiHu (West EPT) Dis.hu (West EPT) Dis. District, TianEPTT, EPTT. Welcome to vist us.